CPS Energy Rotary Plow and Coal Conveyor Installation and Rotary Dumper Building Steel Replacement

Brasfield & Gorrie completed a pair of projects to upgrade this coal-fired power plant. The first build consisted of replacing corroded steel in the below-grade area of the existing coal railroad car unloading facility. A year later, we were awarded a complementary rotary plow and coal conveyor installation that consisted of a 1,126-foot-long reclaim tunnel equipped with a conveyor and coal plows as well as construction of associated buildings. Our team self-performed more than 20,000 cubic yards of concrete work and 270,000 cubic yards of site work.

Client

CPS Energy

Recognition

ABC Excellence in Construction Award