Arthrex Medical Device Manufacturing Facilities

This award-winning manufacturing facility required strategic problem-solving from our team. For example, the insurance policy required a 120,000-gallon holding tank for the sprinkler system, but the client didn’t want large, visible tanks on the property, and putting them below ground would’ve caused different problems. After a meeting of the minds, the client approved of a holding pond as a substitute. The project team worked through design changes and safety challenges all while mitigating scheduling impacts, adding manpower when necessary to help Arthrex meet their ambitious goal.

Client

Arthrex, Inc.

Project Stats

250,000 sq ft

"The team assembled by Brasfield & Gorrie to lead this project is very knowledgeable and professional."

Custer Property Group, Inc.