ATL-DC2 Campus Data Hall Build-outs
We built out nine 6 MW data halls total on this project. The first eight data halls total 25,000 sq ft and the ninth is 50,000 sq ft on its own. Each build-out ranged from five to eight months in duration each.
- Nine 6 MW data hall build-outs (eighth total 25,000 sq ft and ninth totals 50,000 sq ft)
- Five to eight months per build-out
- Type: Live environment data center data hall build-out